Completed Projects

• Integrated Gas Chemical Complex (KPI Inc. LLP)
Project mission : Construction of propane dehydration and polymerization plan to produce 500 thousand tons / year of polypropylene

• Construction Of Aromatic Hydrocarbons Complex (ANPZ LLP) (Completed)
Project mission: increasing the volume of high-octane gasoline components.; production of products with high added value - benzene and paraxylene as raw material for the petrochemical industry.

• Production of motor fuels of ecological class K5 (2nd stage of project implementation) SC Condensate
Project objective: Increase in productivity of the Section for hydrotreating diesel fuel components up to 218.4 thousand tons per a year, Production of motor fuels for ecology class К5.

• Reconstruction of the passenger terminal of Astana International Airport
Project objective: Increase of airport capacity by 1 775 passengers per an hour.

• Solar power plant in Kapshagai by EKK
Project objective: Constructing 100 MW electric power plant.

• Gasification of settlements in Aktobe region
Project objective: Creation of infrastructure for gasification of nearby settlements in Aktobe region.

• Gasification of settlements in Kyzylorda region
Project objective: Creation of infrastructure for gasification of nearby settlements in Kyzylorda region.

• "Construction of the gas pipeline" SARY-ARKA ".
I stage. Kyzylorda-Astana section
Project objective: construction of the Sary-Arka gas pipeline (Kyzylorda-Astana section), consisting of a linear part with a total length of 1061 km and five gas distribution stations.

• Construction of a small hydropower cascade on the Koksai River
Project objective: "Construction of a small hydropower cascade on the Koksai River (Zhualin district, Zhambyl region)"

• Steel tubes production plant
Project mission: Create world class production line for steel tube production in Kazakhstan.

• "Construction of the processing plant, modernization and reconstruction of existing production in Karaganda". «Qaz Carbon» LLP
Project objective: Construction of coal plants, modernization and reconstruction of the existing production, the acquisition of specialized equipment in order to meet local and global demand for energy raw materials in the manufacture of steel products.

• as well as more than a hundred civil engineering projects in the city of Nur Sultan, including:
The Hotel complex the and Business Center “Beijing Palace”;
Kindergarten with 320 places in the RC "Astana High Vill Town;
RC “Infinity" Kabanbai-batyr avenue.

Back to top