Construction of Integrated Gas Chemical Complex

Management Consultancy to SB Petrochemical – private shareholder of Kazakhstan Petrochemical Industries Inc. LLP

Construction of the polypropylene Complex is the first step to create a petrochemical cluster in the region followed by obtaining high-basic products of the industry. 

The Project provides to use worldwide high technology on deep processing of the propane (Phase 1) and ethane (Phase 2) to obtain the following types of commercial product: polypropylene - 500 000 tons per year. 

Complex site will be located 33 km to north-east of Atyrau, 8-9 km north of Karabatan station. The site is located close to the existing railway (9,2 km), highway (6,3 km), water main, power lines and transportation pipelines. All safety distances in accordance with the general widely recognized international standards and best engineering practice have been taken into account during selecting sites and site planning.

 

Back to top